Process Times Calculation

Based on standard times W2MO calculates the necessary work efforts for every logistics process directly out of the layout.

process times

Therefore the increase of efficiency of the logistics will be provided with the same approved principles which have been widely used in the production and assembly areas for a long time. Practical results show that W2MO is able to calculate standard times within +/- 5% of the effective times.

W2MO constantly compares the inputs based on standard times with the effective times. You can measure the standard times for particular company boundary conditions (e.g. staff gathering) if necessary. At the same time the chances for efficiency increases can be analyzed too. Highly productive employees can be identified and rewarded.

By estimating of the orders that have to be processed one can gain a precise workload preview of each logistics operation which is the basis for the required staff planning.